Home >  Term: critical path
critical path

The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project.

0 0

Autors

  • Maxiao
  •  (V.I.P) 19232 points
  • 100% positive feedback
© 2026 CSOFT International, Ltd.